top of page
Search
Carter Group

The Old Creamery - case study

The historic building, the former Old Creamery, in the heart of Budleigh Salterton is undergoing a major renovation and Carter Plant Hire has been called in to assist with lifting steels into place. A delicate operation through window apertures on the second floor.


The steels were collected from the manufacturer and transported to site before the team delicately maneuvered them into place. Good communication between the lift team and the building contractors was essential to ensure no damage was done and that there was minimum disruption to passing traffic and pedestrians.



The ground floor of the building will remain retail premises but the rear of the property - which opens onto Budleigh Salterton's wonderful pebble beach - and the upper floors will become a 5-bedroom house with a gym, atrium and stairlift.


If you have a project that you would benefit from the expertise of a well-established and respected company, please feel free to contact us or telephone 01395 446 446.

35 views0 comments

Recent Posts

See All

Comments


bottom of page